Planned

Physical Design Support

Frontend-to-backend handoff, timing constraint definition, low-power coordination, STA collaboration, and LEC/ECO support for smooth physical implementation. Bridging the gap between RTL and GDSII.

What's Planned

Physical Design Support is a Phase 3 service that bridges the frontend-to-backend boundary. We'll work alongside your PD teams to ensure clean handoffs and swift resolution of backend issues.

Front-End to Back-End Handoff

  • Clean RTL and netlist handoff preparation
  • Constraint handoff coordination
  • Power intent alignment
  • Library and interface consistency review
  • Integration signoff checklist preparation

Timing Constraint Support

  • SDC preparation
  • Clock definition review
  • False-path and multicycle-path coordination
  • Timing exception analysis
  • Constraint debug and refinement

Low-Power Design Coordination

  • UPF and CPF coordination
  • Power domain intent review
  • Isolation and retention requirement alignment
  • Power state definition review
  • Low-power verification coordination

STA Collaboration

  • Timing violation debug with PD and STA teams
  • Setup and hold issue root-cause analysis
  • RTL-side fixes for timing issues
  • Interface timing coordination
  • Signoff issue resolution support

Equivalence and ECO

  • LEC execution and debug
  • ECO change review
  • Functional impact analysis
  • ECO verification
  • Netlist change coordination

Register Your Interest

Physical Design Support is coming soon. Get in touch to discuss your backend coordination needs — we’d love to hear about your challenges.

Get in Touch